Customization: | Available |
---|---|
Production Scores: | Single Variety |
Production Continuity: | Continuous |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Equipment performance and main parameters | |
Equipment operating cycle | 18 seconds |
Equipment operator | 1 person |
Estimated daily production (calculated based on 10 hours) | 200 sets |
Estimated monthly production (calculated on a 24 day basis) | 48000 sets |
Equipment noise | ≤75db |
Overall production line net size | Length 3250mm * Width 2230mm * Height 2300mm |
Power supply standards | AC 380V,50HZ |
Gas supply methods and standards | Seamless steel pipe segmented supply, 0.5~0.8Mp |
Main standard component brand configuration | |
Pneumatic components | SMC |
Sensor | Panasonic |
Programmable logic controller | Mitsubishi |
Servo motor | Mitsubishi |
Touch panel | PROFACE |
Low voltage electrical components | Schneide |
GOTOP -industrial manufacturing automation solutions.
GOTOP always focus on auto parts and motor industry manufacturing automation solutions, whether it is production process automation or production process information systems GOTOP professional technology, provide core technical support to customers.
GOTOP has 59 patents including 7 invention patents (included in the audit) it has passed the National high-tech Enterprise certification the ISO Quality Management System certification the new professional certification, and the certification of small and medium-sized sci-tech enterprises in Shandong province.
GOTOP adheres to the principle of integrity and gratefulness follows the concept of high quality and customer first, accumulates experience constantly enhances r & D strength and creates a bright future with each partner hand in hand!
The competitiveness of the company
research and development:
• Rigorous evaluation and necessary experimental verification
• Build a professional project team
• Continuous improvement in engineering design, Modular rocket
• Keep up-to-date with project progress and feedback
Quality:
• Internal and external design review
• Implement PDCA for material inspection
• Gotop internal acceptance and customer pre-acceptance
• 1 year or above quality assurance
Manufacturing:
• Decompose the assembly process to make it more detailed
• Review the problem every day and make timely improvement
• Unified standard operating procedures and practices
• Implementation of PDCA
Services:
• Technical training
• Long-term free technical support from strategic partners
• Transfer of information and documents